SBUS: Smart e-Bus Battery Substitution Scheme in Vehicular Networks

Jihyeok Seo, Jaehoon Jeong, Hyoungshick Kim, Jung Soo Park

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

This paper proposes a Smart e-Bus Battery Substitution Scheme (called SBUS), tailored and optimized for the commute service of e-Buses using a cloud-based management system. To the best of our knowledge, our scheme is the first attempt to investigate the efficient battery replacement of e-Buses in road networks, based on the trajectories (i.e., Travel routes) of e-Buses in road networks. Through simulations, it is shown that our SBUS scheme outperforms baselines in a road network with multiple bus lines.

Original languageEnglish
Title of host publicationProceedings - IEEE 29th International Conference on Advanced Information Networking and Applications Workshops, WAINA 2015
EditorsLeonard Barolli, Makoto Takizawa, Fatos Xhafa, Tomoya Enokido, Jong Hyuk Park
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages141-145
Number of pages5
ISBN (Electronic)9781479917747
DOIs
StatePublished - 27 Apr 2015
Event29th IEEE International Conference on Advanced Information Networking and Applications Workshops, WAINA 2015 - Gwangju, Korea, Republic of
Duration: 25 Mar 201527 Mar 2015

Publication series

NameProceedings - IEEE 29th International Conference on Advanced Information Networking and Applications Workshops, WAINA 2015

Conference

Conference29th IEEE International Conference on Advanced Information Networking and Applications Workshops, WAINA 2015
Country/TerritoryKorea, Republic of
CityGwangju
Period25/03/1527/03/15

Keywords

  • Battery Substitution
  • Smart e-Bus
  • Vehicular Networks

Fingerprint

Dive into the research topics of 'SBUS: Smart e-Bus Battery Substitution Scheme in Vehicular Networks'. Together they form a unique fingerprint.

Cite this