N2 - Efficient generation of two-dimensional (2D) deliverables from building information models (BIM) entails remarkable challenges, impacting project productivity. To address this issue, BIM-DrawGEN, a rule-based algorithm, was developed in this study to streamline the creation of essential 2D deliverables during the design development phase. This approach involves an analysis of the BIM design process, resulting in the derivation of 76 automation rule sets for generating logically defined 2D deliverables from BIM data. A prototype add-in interfacing with BIM authoring tools was developed to validate the model, demonstrating significant reductions in work nodes and time by 94.54 % and 93.26 %, respectively, for BIM-based drawing creation. Significant reduction in working hours, from nearly a week to under half a day, using BIM- DrawGEN enhances both industrial and academic outcomes. This efficiency enables designers to focus more on design rather than documentation. This study identifies and addresses inefficient processes in BIM, demonstrating that targeted automation could significantly improve design quality and productivity.
AB - Efficient generation of two-dimensional (2D) deliverables from building information models (BIM) entails remarkable challenges, impacting project productivity. To address this issue, BIM-DrawGEN, a rule-based algorithm, was developed in this study to streamline the creation of essential 2D deliverables during the design development phase. This approach involves an analysis of the BIM design process, resulting in the derivation of 76 automation rule sets for generating logically defined 2D deliverables from BIM data. A prototype add-in interfacing with BIM authoring tools was developed to validate the model, demonstrating significant reductions in work nodes and time by 94.54 % and 93.26 %, respectively, for BIM-based drawing creation. Significant reduction in working hours, from nearly a week to under half a day, using BIM- DrawGEN enhances both industrial and academic outcomes. This efficiency enables designers to focus more on design rather than documentation. This study identifies and addresses inefficient processes in BIM, demonstrating that targeted automation could significantly improve design quality and productivity.
KW - 2D deliverable
KW - 2D extract
KW - Automation
KW - BIM design
KW - BIM-Based drawing
KW - Building information modeling (BIM)
KW - Design development stage
KW - Rule-based algorithm
UR - https://www.scopus.com/pages/publications/85206347986
U2 - 10.1016/j.jobe.2024.111033
DO - 10.1016/j.jobe.2024.111033
M3 - Article
AN - SCOPUS:85206347986
SN - 2352-7102
VL - 97
JO - Journal of Building Engineering
JF - Journal of Building Engineering
M1 - 111033
ER -