RFID+4D CAD for progress management of structural steel works in high-rise buildings

Research output: Contribution to journalArticlepeer-review

136 Scopus citations

Abstract

This research presents a strategy and information system to manage the logistics and progress control of structural steel works under the integrated environment of radio frequency identification and four-dimensional computer-aided design (4D CAD). Considering the characteristics of the manufacturing and erection processes of structural steel works in high-rise building construction from a practical point of view, this research has developed a strategy to support successful application of these two state-of-the-art technologies and has developed an information system to support the logistics and progress management based on this strategy. The results of this research have been validated and verified through real-world applications in two high-rise building construction projects considering realistic constraints. Time study has been conducted to verify the efficiency of the proposed information system. In addition, lessons learned and issues identified through these real-world applications are described and discussed in this paper.

Original languageEnglish
Pages (from-to)74-89
Number of pages16
JournalJournal of Computing in Civil Engineering
Volume22
Issue number2
DOIs
StatePublished - 2008

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • Automatic identification systems
  • Buildings, high rise
  • Computer aided design
  • Construction management
  • Information technology (IT)
  • Steel structures

Fingerprint

Dive into the research topics of 'RFID+4D CAD for progress management of structural steel works in high-rise buildings'. Together they form a unique fingerprint.

Cite this