Skip to main navigation Skip to search Skip to main content

Implementation and outcomes of a critical pathway for lumbar laminectomy or microdiscectomy

  • Sang Bong Chung
  • , Sun Ho Lee
  • , Eun Sang Kim
  • , Whan Eoh
  • Sungkyunkwan University

Research output: Contribution to journalArticlepeer-review

Abstract

Objective: The aim of this study is to implement a critical pathway (CP) for patients undergoing lumbar laminectomy or microdiscectomy and describe the results before and after the CP in terms of length of hospital stay and cost. Methods: From March 2008 to February 2009, 61 patients underwent lumbar laminectomy or microdiscectomy due to stenosis or one- or two-level disc herniation in our department and were included in the prepathway group. After development and implementation of the CP in March 2009, 58 patients were applicable for the CP, and these were classified as the postpathway group. Results: The CP, which established a 6-day hospital stay (5 bed-days), was fulfilled by 42 patients (72.4%) in the postpathway group. The mean length of stay was 5.4 days in the postpathway group compared to 6.9 days in the prepathway group, demonstrating a 20% reduction, which was a statistically significant difference (p≤0.000). There was a statistically significant reduction in charges for bed and nursing care (p=0.002). Conclusion: Implementation of a CP for lumbar laminectomy or microdiscectomy produced significant decreases in length of hospitalization and charges for bed and nursing care. We believe that this CP reduces the unnecessary use of hospital resources without increasing risk of adverse events.

Original languageEnglish
Pages (from-to)338-342
Number of pages5
JournalJournal of Korean Neurosurgical Society
Volume51
Issue number6
DOIs
StatePublished - Jun 2012
Externally publishedYes

Keywords

  • Clinical pathways
  • Critical pathway
  • Laminectomy
  • Microdiscectomy

Fingerprint

Dive into the research topics of 'Implementation and outcomes of a critical pathway for lumbar laminectomy or microdiscectomy'. Together they form a unique fingerprint.

Cite this