Abstract
Recently Building Information Modeling (BIM) has been widely used to manage building information throughout the project life-cycle more effectively and efficiently. Particularly in quantity take-off and estimation, BIM-based process is getting more and more attention, and even BIM-based quantity take-off at the most detailed level has been performed in several building projects in South Korea. The practitioners involved in those projects have pointed out that modeling rough and finish interior of a building occupies a big portion of time in the whole modeling process and the manual modeling for interior is error-prone, which could cause serious result, such as wrong cost estimation and disputes. To resolve the problem, this research proposes an automated modeling method that model a building interior automatically after selecting an interior method by a room or space basis. This research develops a interior modeling method and a system that can model various rough and finish interior components automatically at once after a user select the type of interior for a given space or room. To do so, this research identifies typical interior types of buildings and a house built in South Korea, and develops a mechanism that can support modeling both typical and non-typical types of interior by allowing the flexibility in selecting interior material and components and the order of construction process for the selected items. The automated modeling system for building interior has been preliminarily tested at a typical condominium building project and found that the system could improve dramatically the productivity of BIM-based quantity take-off and estimation process.
| Original language | English |
|---|---|
| Pages | 492-496 |
| Number of pages | 5 |
| State | Published - 2009 |
| Event | 2009 26th International Symposium on Automation and Robotics in Construction, ISARC 2009 - Austin, TX, United States Duration: 24 Jun 2009 → 27 Jun 2009 |
Conference
| Conference | 2009 26th International Symposium on Automation and Robotics in Construction, ISARC 2009 |
|---|---|
| Country/Territory | United States |
| City | Austin, TX |
| Period | 24/06/09 → 27/06/09 |
Keywords
- Building Information Modeling (BIM)
- Quantity take-off
- Three-dimensional CAD model
Fingerprint
Dive into the research topics of 'Automated building information modeling system for building interior to improve productivity of bim-based quantity take-off'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver