Abstract
It is important to clear the fault and prevent resulting in damage to power system. Although the frequency of generator internal fault is relatively low, it can lead to incalculable damage to power system as well as generator. Especially, loss of field on generator can cause the generator to lose synchronism for a short time if it is not removed promptly. Therefore, it is needed to conduct research on loss of field relay for detecting or clearing the loss of field. However, the setting of the relay may vary in generator operator or engineer, and the relay is not coordinated well with other elements associated with loss of field. In this paper, we address specifically the coordination of positive offset mho loss of field relay which is one of the protection schemes for loss of field. Computer simulations are performed by using ElectroMagnetic Transients Program-Restructured Version (EMTP-RV) based on actual data.
| Original language | English |
|---|---|
| Pages (from-to) | 1326-1333 |
| Number of pages | 8 |
| Journal | Transactions of the Korean Institute of Electrical Engineers |
| Volume | 65 |
| Issue number | 8 |
| DOIs | |
| State | Published - Aug 2016 |
Keywords
- 40Ry
- Coordination
- GCC
- Loss of Field
- SSSL
- UEL