Abstract
Recently, more electric power facilities have been miniaturized and it is noted that the facilities maintenance will be essential through operation optimization. In this paper we applied and examined the operation optimization of electric power facilities by applying Matrix system which can improve reliability to minimize outage and recover failure rapidly when blackouts happen at 25.8kV Gas Insulated Switchgear(GIS). The fundamental problem for facilities maintenance of GIS can happen due to indeterminable internal state in real time. Matrix optimization organizes action states in all containers which contain pressurized SF6 Gas such as circuit breaker, disconnector switch, bus for utilizing them each area. Then, we connect it with power system to monitor and control internal state remotely in real time, and we can minimize blackout zone or outage. Considering above process, we improved stability of overall facilities.
| Original language | English |
|---|---|
| Pages (from-to) | 507-512 |
| Number of pages | 6 |
| Journal | Transactions of the Korean Institute of Electrical Engineers |
| Volume | 66 |
| Issue number | 3 |
| DOIs | |
| State | Published - Mar 2017 |
Keywords
- Blackout zone
- CB
- Electric power facilities
- GIS
- Matrix system
- Monitor control
Fingerprint
Dive into the research topics of 'A study on optimization of electric power facilities applied matrix system at 25.8kV GIS'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver