Abstract

As recent building have been getting higher and larger, vertical lift planning and operation are key factor for successful project. Although many studies have been trying to set up a construction lift planning system at early stage before lift installation, but there are not regarding lift management for on-going project using operation data from the field. In this study In this study, to predict lifting event which may be generated during remained construction schedule, long-term time-series based data analysis was conducted. Data was collected embedded lift monitoring sensor and database. The pattern analysis was carried out reflecting characteristics of Tact based finishing work control. And this study shows an effective value of activity oriented time-series analysis to lift management on high-rise building construction. Lastly, this study has served as a key lead of lift monitoring based decision-making for vertical lift zoning. Therefore, it is anticipated to settle as a system based data-centric construction management technique in the field.

Original languageEnglish
Pages (from-to)121-127
Number of pages7
JournalProcedia Engineering
Volume196
DOIs
StatePublished - 2017
EventCreative Construction Conference, CCC 2017 - Primosten, Croatia
Duration: 19 Jun 201722 Jun 2017

Keywords

  • Construction Lift
  • Finishing work schedule
  • Time-series analysis

Fingerprint

Dive into the research topics of 'A Prediction Method of Vertical Lifting Loads Based on Long-term Time Series Analysis for High-rise Building Construction'. Together they form a unique fingerprint.

Cite this